Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Español |Deutsch |Pусский |
| No.13678310
| No.13678310
- Product Categories
- Friendly Links
- home > Supply > Jinda waterproofing membrane manufacturers introduced the construction and operation of fire-fighting water layer
Jinda waterproofing membrane manufacturers introduced the construction and operation of fire-fighting water layer
| Information Name: | Jinda waterproofing membrane manufacturers introduced the construction and operation of fire-fighting water layer |
| Published: | 2015-06-08 |
| Validity: | 30 |
| Specifications: | Custom |
| Quantity: | 89999.00 |
| Price Description: | |
| Detailed Product Description: | Jinda waterproofing membrane manufacturers introduced the construction and operation of fire water waterproof layer construction sequence, according to the wall after the first floor, the first additional layer Omo, first floor surface construction pit (sump) later. Polyethylene fiber waterproofing membrane construction temperature should be above 5 ℃ 25 ℃ or less carried, rain, snow, wind and 5 above weather prohibit construction, encounter rain in the rain to do the construction measures. Screed acceptance, grass in the wet conditions as long as no clear water can be construction. Polyethylene fiber waterproofing membrane paste and laying operations shall be as follows: (1) determine the direction of the web paste. When the slope 3%, the web may be parallel or perpendicular to the slope paving. Requirements: upper and lower coil Paving shall mutually perpendicular. (2) Before basement waterproofing layer construction, should first do nodes, additional layers and pile foundation reinforcement is relatively concentrated parts of the processing, and then up from the lowest level of the construction. (3) Before polyethylene fiber waterproofing membrane paste, laying part of the coil preamplifier about 3-12 meters, find the right direction, intermediate fixed. One end of the coil to a fixed volume at the adhesive coating shop, which ends after paste, and then the pre-release of the web roll back to the other end position has been glued continuously until the entire paste. (4) The method of laying coating: First, a previously prepared plastic container with a small fall in the leveling layer at pre sticky glue to continuously evenly, do not open at the end do not build, thickness should be maintained at 1mm, and then shop the web scraper exhaust compaction, discharged excess glue. (5) Coil paving method using the lap, lap seam roll width: the long side and short side are 100mm, upper and lower, take junction adjacent two slit coil and the main waterproof layer and an additional layer of overlapping joints should be staggered over one-third of the width. (6) full sticky web take junction seam, the seam after seam edge compacted layer of cement paste and then brushing the seam tightly sealed seams not allowed to have open at the end, to fight wrinkles, warpage phenomenon from space . (7) vertical longitudinal plane must be pasted pasted composite membrane, from the top down on the positive, from the bottom up exhaust compaction requirements grass and roll while coating, roll full bonding. About fire water waterproof layer construction Jinda waterproof membrane manufacturers to introduce them want to know more information waterproofing membrane, give us a call now, we will be happy to serve you! |
Admin>>>
You are the 9404 visitor
Copyright © GuangDong ICP No. 10089450, Laiwu City of Geotechnical Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 9404 visitor
Copyright © GuangDong ICP No. 10089450, Laiwu City of Geotechnical Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

