Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Español |Deutsch |Pусский |
| No.13678310

- Product Categories
- Friendly Links
- home > Supply > Waterproof board manufacturers to introduce water board leakage in the construction process improvements reasons
Waterproof board manufacturers to introduce water board leakage in the construction process improvements reasons
Information Name: | Waterproof board manufacturers to introduce water board leakage in the construction process improvements reasons |
Published: | 2015-05-11 |
Validity: | 90 |
Specifications: | Complete |
Quantity: | 9999.00 |
Price Description: | |
Detailed Product Description: | Laiwu of Shandong Jinda waterproof board manufacturers to introduce the water board in the construction process improvements leakage reason water board in the construction process, due to environmental constraints and technical and construction personnel responsibility and other factors, waterproof board welding parts once how to deal with the problem of leakage and improve it? Today, we share this problem: - waterproof plate welding leakage occurs when there is: a small vertical wall and arch wall waterproof plate welding joints height of 1.5m, workers in the construction unfavorable torch construction; second, working class construction staff due sense of responsibility is not in place, not in accordance with the requirements of technical tests before each test welding work welding construction waterproof board directly on the wall in the arch pad temperature machine debugging; third, waterproof sheet material superior fracture, deformation , empty place, construction workers before construction of the water board is not carefully examined, welding and other damage to the position, will the fracture and deformation of the waterproof plate welding; Fourth, reinforcing steel bar welding classes at local bars Burns waterproof board, waterproof board working class that is in effect when welding steel skeleton banding completed, construction workers welding inconvenient, poor welding results. Construction site welding torch passing rate than the pad portion of a machine used to be low, to minimize the possibility of using a welding torch, adjust the position of responsibility and construction process from staff of gun used, to ensure the welding quality standards. Improvement: Small straight wall and arch wall waterproof plate welding joints height adjustment, the position is the most appropriate use of the wrist height person; two with the nature of the test welding waterproof board, waterproof board welding of the batch selected the best temperature and optimal welding speed as construction parameters; strengthen the operation and accountability construction workers; when using a ring each water board, there must be someone on the overall film waterproof board were checked once, found substandard parts depending on their corruption The situation mutilation or replacement of the process; adjust reinforced coordination between class and working class of the water board, so check each other, mutual supervision. More waterproof board aspects, please call the company service personnel! Waterproof board supplier http://www.jdfangshuiban.com |
Admin>>>
You are the 9404 visitor
Copyright © GuangDong ICP No. 10089450, Laiwu City of Geotechnical Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 9404 visitor
Copyright © GuangDong ICP No. 10089450, Laiwu City of Geotechnical Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility